Pages

Saturday, January 29, 2011

The Dam Run 5K


Today I was able to run a 5K with my dad...something that I've always wanted to do. It was a chilly day in Orinda, but a beautiful January morning. We had a great time.



I'm proud of how we ran. I came in 4th in my age bracket and 15th out of 89 women. I finished at 28:07...

Friday, January 21, 2011

Kids/Guest Bathroom Re-do

The beginning of this month, we had one of the guys from our ministry move in with us until he gets married at the end of this coming September. Since the bathroom he is using is the one place we haven't touched since moving in except for replacing the toilet, we decided that it was time to make some improvements in there.

Here are a few before pictures:

This is the nasty fan that didn't work at all...
It was so caked with grime and junk. I was thoroughly disgusted when I was cleaning it out. I thought if we cleaned it, then it would work...I was wrong. We ended up replacing the motor and fan blades (which was much cheaper than replacing the whole fan)



The medicine cabinet was broken when we moved in as well, so we decided to remove it and Phil built a built-in to replace it.



I don't have a before for the mirror that was up there, but it was a pretty standard
gigantic mirror that stretched from wall to wall. We removed it.


Here are the after shots:

In this shot, we still didn't have a mirror...we do now, which will be my next post...but here, you can see the new paint color (which is the wrong color, so eventually we're going to re-paint the bathroom a shade darker)

Here you can see some of the wainscoting behind the toilet

We put up wainscoting all around the bathroom. We think it makes the bathroom feel so much more fresh and clean.


We put in a new low-flow shower head (which, by the way, we did in our bathroom as well). We just got our latest water bill and have already saved $10 off our bill just from our shower usage alone!


Here is the built-in Phil constructed. We still need to put shelves in, but I think this is a huge improvement from what was there...



Overall, this took us about 2 solid days and a few nights to complete...not bad considering what we did (new lighting, new shower head, built-in medicine cabinet, paint, and wainscoting). I still have new drawer pulls to install as well.